The Wiri EMU depot is a 7200m2 state-of-the-art facility designed to maintain Auckland’s new fleet of electric trains. Opened in July 2013, the depot included extensive native planting and low impact stormwater design initiatives.
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed